Here is a part adapted from the article above. As usual the mounting holes are only on silkscreen. If you want the mounting holes drilled you need to drag a hole from the pcb section of core parts in to the sketch and set it to 2mm diameter and position it over the 4 mounting holes.
1_54in_240x240_tft_display.fzpz (5.7 KB)
Peter